Click on a photo to enlarge.
A condo complex in Pigeon Forge was facing serious humidity issues in their electrical room. The excess moisture was beginning to impact the functionality and longevity of their equipment—something no property owner wants to deal with. Our team stepped in with a tailored solution to help control the environment and protect this critical space for the long haul.
The electrical room was dealing with constant humidity, which started to interfere with the performance and reliability of the equipment inside. Left unchecked, this kind of moisture can lead to costly damage or even safety concerns.
With a customized moisture control solution in place, this electrical room is now dry, protected, and ready to operate at full capacity—without the threat of humidity wreaking havoc behind the scenes.
This homeowner in Jefferson City, TN had a cluttered, debris-filled crawlspace. Master Services cleared it out to make room for our Vapor Barrier system and a wall joist.
A resident near Jefferson City, TN was aware of moisture issues in their basement and reached out to our team for an inspection. After examination, we determined that a reliable system was necessary. We proposed our TripleSafe sump pump and perimeter drainage system, which effectively captures and channels water outside the home.
Our team from Master Services recently conducted a site visit to a house in Jefferson City, TN, where we identified signs of foundation instability caused by soil settling. It was evident that immediate action was necessary to safeguard the structural integrity, particularly around the house corner. After careful evaluation, we determined that helical piers were the ideal solution for the specific terrain in Tennessee. These piers are designed to effectively reinforce the foundation and ensure long-lasting stability, while minimizing any disruption to the surrounding yard.
In Jefferson City, TN, a homeowner encountered a sinking concrete slab beneath their AC unit caused by soil settlement. It was imperative to stabilize the slab and prevent further displacement towards the house wall. At this juncture, Master Services intervened with our innovative PolyLyft solution, a high-density product designed to swiftly elevate sinking concrete back to its original position within minutes! Additionally, we provided extra support to reinforce the ventilation unit.
our service area